By Chris Bergin, 2/13/2007 10:26:10 AM
United Space Alliance (USA) engineers are working on a troubleshooting plan,
following 'erratic' chamber pressure readings on the right hand SRB (Solid
Rocket Booster).
The issue - which was noted last night without specifics - is still expected
to delay rollout by 24 hours, although engineers are looking at possibly
continuing their evaluations on the launch pad. However, two of the IPRs (In
Process Reviews) are officially classed as constraints to rollout.
http://www.nasaspaceflight.com/content/?cid=5021
--
--------------
Jacques :-)
www.spacepatches.nl |
|
|
| Back to top |
|
| Brian Gaff |
Posted: Tue Feb 13, 2007 6:31 pm |
|
|
|
Guest
|
Well I've read that page, and I'm not much wiser. there is so much text
mixed up on that page that reads in with the text that its a bit like those
spams with embedded rubbish you sometimes get.
So what is it, the nozzle moving or what?
Brian
--
Brian Gaff - briang1@blueyonder.co.uk
Note:- In order to reduce spam, any email without 'Brian Gaff'
in the display name may be lost.
"Jacques van Oene" <oene0072@planet.nl> wrote in message
news:45d1f4ce$0$2021$ba620dc5@text.nova.planet.nl...
Quote: Atlantis' booster requires troubleshooting
By Chris Bergin, 2/13/2007 10:26:10 AM
United Space Alliance (USA) engineers are working on a troubleshooting
plan, following 'erratic' chamber pressure readings on the right hand SRB
(Solid Rocket Booster).
The issue - which was noted last night without specifics - is still
expected to delay rollout by 24 hours, although engineers are looking at
possibly continuing their evaluations on the launch pad. However, two of
the IPRs (In Process Reviews) are officially classed as constraints to
rollout.
http://www.nasaspaceflight.com/content/?cid=5021
--
--------------
Jacques :-)
www.spacepatches.nl
|
|
|
| Back to top |
|
| Brian Gaff |
Posted: Wed Feb 14, 2007 4:48 am |
|
|
|
Guest
|
I hope they are 100 percent happy that there is no leak in a booster. I mean
look what happened last time there was a leak...
Brian
--
Brian Gaff....Note, this account does not accept Bcc: email.
graphics are great, but the blind can't hear them
Email: briang1@blueyonder.co.uk
______________________________________________________________________________________________________________
"Jacques van Oene" <oene0072@planet.nl> wrote in message
news:45d1f4ce$0$2021$ba620dc5@text.nova.planet.nl...
Quote: Atlantis' booster requires troubleshooting
By Chris Bergin, 2/13/2007 10:26:10 AM
United Space Alliance (USA) engineers are working on a troubleshooting
plan, following 'erratic' chamber pressure readings on the right hand SRB
(Solid Rocket Booster).
The issue - which was noted last night without specifics - is still
expected to delay rollout by 24 hours, although engineers are looking at
possibly continuing their evaluations on the launch pad. However, two of
the IPRs (In Process Reviews) are officially classed as constraints to
rollout.
http://www.nasaspaceflight.com/content/?cid=5021
--
--------------
Jacques :-)
www.spacepatches.nl
|
|
|
| Back to top |
|
| Brian Thorn |
Posted: Sat Feb 17, 2007 3:46 pm |
|
|
|
Guest
|
On Wed, 14 Feb 2007 08:48:25 GMT, "Brian Gaff"
<Briang1@blueyonder.co.uk> wrote:
Quote: I hope they are 100 percent happy that there is no leak in a booster. I mean
look what happened last time there was a leak...
The problem is a faulty pressure sensor... one of three in each SRB.
The other two show 'normal'. It is being likened to the ECO fiasco.
I think the plan is to replace all six, just to be safe.
Brian |
|
|